Close Menu

    Tech Gaming News

    Independent, UK-based gaming hardware and news. Tested for longer. Told straight.

    Get Patch Notes

    Latest

    GTA 6 Release Time, Download Size and Price: Everything You Need to Know

    November 16, 2026

    Nvidia Has a New CEO: Jensen Huang Resigns and Colette Kress Takes Over

    November 16, 2026

    Vulcan Rocket Failure: What Happened to Amazon’s 40 Leo Satellites

    November 16, 2026

    League of Legends: New Dawn Is Riot’s 2027 Overhaul of the Game

    November 16, 2026
    Facebook X (Twitter) Instagram
    TGNTech Gaming News
    • Setups
    • Guides
    • Views
    • How We Test
    • About
    Get Patch Notes
    TGNTech Gaming News
    Home»News»Vulcan Rocket Failure: What Happened to Amazon’s 40 Leo Satellites
    News

    Vulcan Rocket Failure: What Happened to Amazon’s 40 Leo Satellites

    TGN TeamBy TGN TeamNovember 16, 2026Updated:November 16, 2026No Comments6 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Line drawing of a rocket with a dashed flight path ending in a red cross, labelled Vulcan, 40 Amazon Leo satellites lost
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Quick answer: the Vulcan rocket failure happened on Sunday 15 November 2026, about 10 minutes after a United Launch Alliance (ULA) Vulcan lifted off from Cape Canaveral. It did not reach orbit, and its payload of 40 Amazon Leo broadband satellites was lost. ULA has opened an investigation and has not named a cause. It is ULA’s first total launch failure since the company was formed in 2006.

    The short version

    • When: Sunday 15 November 2026, 17:40 GMT, from Cape Canaveral
    • Payload lost: 40 Amazon Leo broadband satellites
    • Cause: not yet known, investigation under way
    • ULA record: first total mission failure since 2006

    The flight was Vulcan’s return to flight, and the first of 38 Vulcan missions Amazon has booked to build Leo, its planned rival to SpaceX’s Starlink.

    What happened to the Vulcan rocket?

    The rocket lifted off from Space Launch Complex 41 at Cape Canaveral Space Force Station, Florida, at 12:40 EST (17:40 GMT). Spaceflight Now reported that it was Vulcan’s fifth flight, and its first in nine months.

    ULA said that, based on data received by its launch director, the vehicle “suffered an anomaly 10 minutes into the flight and failed to deliver the Amazon mission to orbit”. It said it did not yet have “any specific data to understand what occurred”.

    Reporting from the launch broadcast describes what could be seen, without settling the cause:

    • The six solid rocket boosters appeared to perform normally and separate as planned.
    • The twin BE-4 main engines, built by Blue Origin, then appeared to fire for longer than ULA’s pre-launch timeline suggested. Ars Technica reported they were due to shut down just before the five-minute mark but ran for at least another 30 seconds.
    • After the main engines shut down, Ars Technica reported that ULA’s telemetry animation showed the rocket starting to spin. The Centaur V upper stage then ignited and appeared to try to correct the path. ULA ended its broadcast shortly afterwards and later declared the launch a failure.

    Ars Technica, citing multiple sources, reported that the anomaly was in the booster stage. Spaceflight Now, reading ULA’s update, said something went wrong during the Centaur burn. Neither account is an official finding. Until ULA completes its investigation, the cause is unknown.

    Spaceflight Now also noted that a launch attempt was scrubbed on Friday, another delay was called on Saturday, and controllers held the countdown at T-minus 20 seconds on Sunday before lifting off at the end of the window. It is not known whether any of those issues were linked.

    What has ULA said?

    ULA said it would “find the cause, determine the appropriate corrective action, and return to flight as quickly as possible”, and promised customers visibility into the investigation.

    In a longer statement reported by Ars Technica, the company said it holds itself “to the standard of mission success”, adding: “Today, we did not meet that standard.”

    This is ULA’s first total mission loss in its 20-year history. On two of Vulcan’s four earlier flights, problems with solid rocket booster nozzles were overcome in flight and the payloads still reached orbit. Sunday’s failure is different: the satellites were lost, and the rocket is expected to be grounded while the investigation runs.

    What does the Vulcan rocket failure mean for Amazon Leo?

    Amazon Leo, previously called Project Kuiper, is Amazon’s satellite broadband network. It is built to compete directly with SpaceX’s Starlink.

    Ars Technica reported that the constellation has about 396 satellites in orbit, against a planned first-generation total of 3,292. Sunday’s mission was the first of 38 Vulcan launches Amazon has reserved with ULA, each meant to carry 40 or more satellites.

    Losing 40 satellites is a setback. The bigger problem is the likely pause in Vulcan flights. Ars Technica reported that Amazon has already built its 1,000th satellite, so much of the constellation is waiting on the ground. Amazon officials said in October they had enough satellites to start initial commercial service by the end of the year, but still need more launches to reach full capacity.

    Amazon said: “There is risk with any launch, and that’s especially true for inaugural missions like LV-01. ULA has been a trusted partner for Amazon, and we believe they’ll learn from this mission and deliver on their long-term plans for Vulcan.”

    Amazon is not relying on Vulcan alone. It also has launches booked on Arianespace’s Ariane 6, Blue Origin’s New Glenn and SpaceX’s Falcon 9. Ars Technica reported that Amazon’s Ariane 6 contract covers 24 flights, three of which have flown, with a fourth due later this month. New Glenn, however, has been grounded since a pad explosion in Florida in May.

    Could this affect other rockets?

    It’s too early to say. Vulcan’s first stage uses two methane-fuelled BE-4 engines from Blue Origin, which uses a version of the same engine on New Glenn. Investigators previously traced May’s New Glenn explosion to a faulty valve on a BE-4. Spaceflight Now reported that the engines flown on Sunday had already been retrofitted with a fix.

    If the Vulcan investigation points to the BE-4s, that could affect New Glenn’s return to flight. If it doesn’t, the two events may be unrelated. ULA has not blamed the engines, and neither are we.

    The failure matters beyond Amazon. Vulcan is contracted to launch a large share of US national security missions, and earlier Vulcan delays had already led the US Space Force to move some flights to SpaceX. NASA administrator Jared Isaacman, in a public reply reported by Spaceflight Now, offered NASA’s help and said “Artemis, Moon Base, and the nation need ULA”.

    Questions people ask

    What caused the Vulcan rocket failure?

    ULA has not identified a cause. It said the rocket suffered an anomaly 10 minutes into the flight and failed to reach orbit. An investigation is under way.

    How many Amazon satellites were lost?

    Forty Amazon Leo broadband satellites were on board and were not delivered to orbit.

    Has a ULA rocket failed before?

    Ars Technica and Spaceflight Now describe this as ULA’s first total mission failure since it was formed in 2006. Earlier Vulcan flights had close calls with solid booster nozzles, but those payloads still reached orbit.

    What is Amazon Leo?

    Amazon Leo is Amazon’s satellite broadband network, previously called Project Kuiper, built as a competitor to SpaceX’s Starlink. Ars Technica reported about 396 satellites in orbit, with 3,292 planned in the first generation.

    Will the Vulcan rocket fly again soon?

    ULA says it wants to find the cause, fix it and return to flight as quickly as possible, but has not given a date. The rocket is expected to be grounded while the investigation is completed.

    Sources

    • Ars Technica: launch report
    • Spaceflight Now: ULA statement, flight history and NASA comment
    • SpaceNews: Vulcan launch of Amazon Leo satellites fails
    • The Verge: lost satellites

    Where next

    More tech news: Tesla’s Cybercab pre-orders and the monthly fee, and Nvidia’s new interim CEO.

    Amazon Leo Blue Origin Satellites Space United Launch Alliance Vulcan
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    TGN Team
    • Website

    The Tech Gaming News team: we live with the kit before we tell you what we think of it.

    Related Posts

    GTA 6 Release Time, Download Size and Price: Everything You Need to Know

    November 16, 2026

    Nvidia Has a New CEO: Jensen Huang Resigns and Colette Kress Takes Over

    November 16, 2026

    League of Legends: New Dawn Is Riot’s 2027 Overhaul of the Game

    November 16, 2026

    Anthropic IPO: Price Range, Trading Date and What the Filing Says

    November 16, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Patch Notes

    The week in gaming tech in five minutes, every Sunday.

      Latest setups

      What to Look For in a Gaming Desk: Size, Height, Build

      November 15, 2026

      How to Choose a Gaming Controller: Drift, Grip and Compatibility

      November 15, 2026

      Gaming Chair Buying Guide: How to Choose One That Fits

      November 15, 2026

      Gaming Accessories Worth Buying, in the Order We’d Buy Them

      November 15, 2026
      Guides

      15 Things to Know Before You Buy Pokémon Cards

      November 15, 2026

      How to Build a Gaming PC: A Step-by-Step Guide for First-Timers

      November 15, 2026
      Facebook X (Twitter) YouTube
      • About
      • How We Test
      • Ethics & Affiliates
      • Patch Notes
      • Send Us Your Setup
      • Write for Us
      • Get in touch
      © 2026 Tech Gaming News. Independent, reader-first, UK-based.

      Type above and press Enter to search. Press Esc to cancel.